Institutional Facility
Project Description:
The Maplewood High School project aimed to modernize the facility’s infrastructure, ensuring a robust and efficient plumbing system that meets the demands of a dynamic educational environment. With a focus on precision and long-term functionality, the project required seamless integration of plumbing networks within the existing structure.
Scope of Work:
BSPK provided LOD 400 Plumbing Modeling & Coordination, delivering highly detailed and constructible models that ensured accurate prefabrication and installation. Our team coordinated complex piping layouts, optimized space constraints, and resolved clashes to streamline the construction process.
Summary:
Educational facilities pose unique challenges, especially when integrating modern plumbing systems into existing structures without disrupting daily operations. But at BSPK, We Know BIM Better. Our team navigated tight mechanical rooms and intricate ceiling spaces, ensuring every pipe and fixture fit perfectly within the high school’s framework. By leveraging advanced coordination and detailed modeling, we delivered a fully optimized, clash-free system, reducing rework and accelerating project timelines.